Cleveland Breakwater: 10 Years of Proven Performance with MESURIS Technologies

Ten years after its rehabilitation, the Cleveland Harbor East Breakwater in the United States demonstrates the importance of accurate concrete armour unit placement in coastal engineering. MESURIS is proud to have contributed to this major project with its POSIBLOC™ and VISIBLOC technologies.

Protecting Cleveland Harbor against challenging Lake Erie conditions

Located on the shores of Lake Erie, Cleveland Harbor is a strategic hub for maritime transportation and the regional economy.

In 2012, extreme weather conditions associated with Superstorm Sandy caused significant damage to sections of the harbor’s East Breakwater, requiring extensive rehabilitation work.

Completed in November 2016 after 17 months of construction, the project strengthened approximately 1,300 metres (4,275 feet) of breakwater through the installation of 16,743 concrete Dolos armour units, each weighing approximately 6.5 tonnes.

These specially shaped concrete units interlock to dissipate wave energy and provide long-term protection for critical harbor infrastructure.

POSIBLOC™ and VISIBLOC: precision for marine construction

For this project, contractor Great Lakes Dock & Materials LLC used technologies developed by MESURIS.

The POSIBLOC™ 3D positioning system, together with VISIBLOC, supported the accurate placement and monitoring of Dolos armour units, both above and below the water surface.

Installing these massive concrete units requires exceptional precision. Their position, orientation and interlocking are critical factors in the stability and long-term performance of the breakwater.

By providing three-dimensional positioning assistance and monitoring, these technologies help operators place armour units in accordance with project requirements.

This accurate placement contributes to construction quality and the long-term reliability of coastal protection structures.

Ten years later: outstanding results

On November 19, 2026, the U.S. Army Corps of Engineers (USACE), Buffalo District, published a review marking the tenth anniversary of the Cleveland Harbor East Breakwater rehabilitation.

Recent inspections of the section repaired in 2016 revealed highly encouraging results:

  • No noticeable movement of the Dolos armour units.
  • No visible signs of structural distress.
  • Continued performance in line with the original engineering design.

These findings are particularly significant considering the challenging wave, storm and ice conditions experienced along Lake Erie.

The rehabilitated breakwater was designed for a service life of at least 50 years, with regular inspections planned to monitor its condition.

A significant international reference for MESURIS

This successful ten-year performance review represents an important reference for MESURIS.

It demonstrates how sound coastal engineering, experienced marine contractors and advanced positioning technologies can work together to deliver reliable and durable maritime infrastructure.

A decade after construction, the observed stability of the Dolos armour units highlights the quality of this collaborative achievement.

MESURIS congratulates everyone involved in this remarkable project, particularly Great Lakes Dock & Materials LLC and the U.S. Army Corps of Engineers, Buffalo District.

We are proud that our POSIBLOC™ and VISIBLOC technologies contributed to the construction of a breakwater that continues to protect Cleveland Harbor ten years later.

Learn more:

Partagez :

Facebook
Twitter
Pinterest
LinkedIn

Actualités

BLOCKSfit™ New software

The new reference tool to provide “AS BUILT” 3D for all type of single layer armouring construction. BLOCKSfit™ is an innovative software package computing blocks positions

Monaco

The boxes are now connected to the earth Mesuris is proud to participate since 2017, in the exceptional project that is the Monaco Sea Extension